Project overview

A 17-story residential building in Xianning, Hubei Province, China, completed and handed over for use.

Application period

July 2023 to September 2024.

Key highlight

China’s first full-scale CCRA application project to achieve a “seamless transition.” The project switched directly to low-carbon concrete without changing construction methods, equipment or curing standards. Neither the contractor nor the owner reported any adverse feedback.

Technical data

  • Cement reduction: In C30 concrete, cement content decreased from 195 kg/m³ to 145 kg/m³, a reduction of 50 kg/m³ (approximately 25.6%).
  • Mix adjustment: The removed cement was replaced by an equal combined mass of additional GGBS and fly ash, with 2.07 kg/m³ of CCRA added.
  • Strength and acceptance: All structural elements passed acceptance testing using the rebound hammer method, with a 100% strength compliance rate, demonstrating that the low-carbon concrete fully met the design strength requirements.

Benefits summary

The project successfully demonstrated CCRA’s full compatibility with existing Portland cement systems and the feasibility of a seamless transition in field applications, providing a model for subsequent large-scale adoption.

 